“The Nuclear Sublime”: the interior of the UK’s nuclear facilities
“The Nuclear Sublime”: the interior of the UK’s nuclear facilities
“Nuclear Sublime” is a photography project by Michael Collins, Visiting Professor of Photography, University of Suffolk, and a large-format photography book of the same name.
Michael Collins notes: “Nuclear power is the incarnation of the sublime….”.
For three years, Michael Collins has been photographing the interiors of decommissioned and operating nuclear reactors and power stations across the UK. Collins was granted unprecedented access to Dounreay, Sellafield, Chapelcross, Winfrith, Dungeness, Trawsfynydd, Sizewell A and B, Wylfa and Torness. He documented nuclear reactors, nuclear waste storage facilities, control rooms and measuring instruments, and the process of decommissioning old facilities.
The photographs depict the present state and future of Britain’s nuclear industry— usually hidden from public view.
Shield Door, Intermediate Level Waste Store Package Inspection Cell, Trawsfynydd, 2021 Trawsfynydd is a Magnox power station designed by architect Basil Spence. It had two nuclear reactors and was operational between 1965 and 1991. The Intermediate Level Waste (ILW) Store Package Inspection Cell is used to shield operational personnel from elevated radiation during ILW package inspections.Master Slave Manipulator, Dragon Reactor, Winfrith, 2023 The window on the left shows the slave end of the manipulator; the right window shows a fuel spike box with a fuel spike protruding from the box. The Master Slave Manipulator (MSM) is being used for packing fuel spikes and handling radioactive material for analysis.Mortuary Holes B78, Dragon Reactor, Winfrith, No 1, 2023 The purpose of the experimental high-temperature gas-cooled Dragon reactor was to test fuel and materials for the European High Temperature Reactor programme. It operated from 1965 to 1976. These mortuary holes were used to store cooled, spent fuel from the Dragon reactor. The fuel was uranium oxide; it stayed in the mortuary holes for approximately 25 years. When the rods were first placed here, the covers were painted red; only as the radiation diminished were they painted green. The fuel was transferred to Harwell in 2005.Turbine Hall, Chapelcross, No 1, 2022 The turbine hall at Chapelcross contained eight turbines, each painted an individual colour and manufactured by CA Parsons & Co. It is contemporaneous with the turbine hall at Calder Hall.Radioactive Waste Container, Sellafield, 2021 Sellafield, formerly known as Windscale, is Europe’s largest nuclear site. It generated nuclear power from 1956 to 2003, and reprocessed nuclear fuel from 1952 to 2022.Dounreay Prototype Fast Reactor Mortuary Control Panel, 2023 Gauge panel showing gas supply pressures and distribution for all the “mortuary” storage positions for ex-reactor components. Originally argon gas, now replaced with nitrogen, this ensured an inert atmosphere for any item removed from the reactor to prevent oxidisation/fire from sodium on the component. Purging removed active gas to a high active filtered gas vent route, replacing it with non-active clean argon/nitrogen.Oxygen Analyser and X-Ray Machine, Irradiated Fuel Cave, Dounreay Prototype Fast Reactor, 2023 The equipment in the upper half of the photograph is an oxygen analyser and sampler pump, used for monitoring irradiated fuel cell conditions. The irradiated fuel cell has a nitrogen gas atmosphere with analyser/samplers located at numerous locations to ensure oxygen levels remain at acceptable limits. The blue control panel (lower half of the photograph) is the X-Ray equipment for the Prototype Fast Reactor’s irradiated fuel cave. The panel controlled the loading and positioning of X-Ray film plates for post-irradiated examination of fuel sub-assemblies.South wall of the Irradiated Fuel Cave, Dounreay Prototype Fast Reactor, 2023 The yellow steel tubes are adaptor lifting yokes (ALY) which are bolted to the valves below and are used to lift the adaptor valve assemblies and place them on the reactor. The grey wall boxes on the cave wall supply power, instrumentation and gas feeds into the irradiated fuel cave.Interior of Vacuum Vessel Module in the Tokamak AssemblyPit, International Thermonuclear Experimental Reactor, 2022 The protruding structures that dot the inner wall of the vacuum vessel sector are housings for the flexible supports that will be used to anchor the protective blanket shield blocks.Refuelling cavity, Reactor, Sizewell B, No 2, 2023 The reactor’s refuelling cavity is filled with borated water, which controls the nuclear chain reaction. All defuelling and refuelling activities take place fully submerged under borated water. The blue colour of the water is created by Cherenkov radiation. This is a type of electromagnetic radiation that occurs when a charged particle passes through a dielectric medium (such as water) at a speed greater than the phase velocity of light in that medium. The electromagnetic disturbance causes a shock wave of distinctive blue light.Gas Circulator, Advanced Gas-Cooled Reactor, Torness, 2023 Torness, which became operational in 1988, has two Advanced Gas-Cooled Reactors (AGR). Each reactor has eight associated gas circulators which pump the high-pressure carbon dioxide coolant gas to the underside of the graphite core and up the fuel channels where the gas picks up heat generated by the nuclear reaction in the fuel. The gas passes through to the top of the boiler and then down to the gas circulator. As the hot gas passes through, its heat is transferred to the water in the boiler, forming superheated steam at high pressure, which drives the turbine.Control Panel, Pile Cap Crane Control No 1 A, Sizewell A, 2022 The framed diagram (top left, partially cropped) shows the layout of the pile cap apertures which would house the uranium fuel rods. The joystick was used to manoeuvre the crane carrying these rods.Intermediate Level Waste Store, concrete overpack, No 1, Trawsfynydd, 2021 The Intermediate Level Waste (ILW) Store concrete overpack contains ILW packages in storage. These concrete overpacks are used to shield operational personnel from elevated radiation during operations within the ILW store and during cross-site transport between plant areas within the Trawsfynydd Nuclear Power Station site.North Fuel Element Debris Retrieval Plant Sort Cell Window and Manipulators, Trawsfynydd, 2021 This is used to shield operational personnel from elevated radiation and contamination during Intermediate Level Waste retrieval and processing.Inside the Dounreay Prototype Fast Reactor sphere on the reactor floor, No 2,2023 Undergoing decommissioning. In the foreground is one of the giant legs of the circular Goliath crane.Pond, Chapelcross, 2022 Chapelcross was operational from 1959 to 2004. It is the sister plant to Calder Hall in Cumbria (Sellafield). Chapelcross had four Magnox reactors. The pond is used as interim storage for spent nuclear fuel used in the reactors. The water in the pond cools the spent nuclear fuel and provides a shield from the radiation.Intermediate Level Radioactive Waste “Product” Store, Sellafield, 2021 Still under construction, this reinforced warehouse will hold concrete and metal cubes containing intermediate level radioactive waste. Once full, it will be sealed.Dounreay Prototype Fast Reactor Hall Below 14 Foot Floor Facing West, 2023 The grey mass in the epicentre of the background is the reactor rotating shield. In the foreground (including one partially hidden by a vertical beam) are the intermediate heat exchangers.Window No 10, Irradiated Fuel Cave, Dounreay Prototype Fast Reactor, 2023 Foreground shows manipulators and lathe ready for operational control. The orange/yellow colour in the cave is an effect caused by sodium lamps. Inside the Dounreay Fast Reactor sphere on the reactor floor, No 1, 2023 In the foreground is one of the giant legs of the circular Goliath crane, which was used to lift the flasks into position to enable the withdrawal and insertion of the uranium fuel rods.Manifolds and Valve Control Systems, Cryoplant, International Thermonuclear Experimental Reactor, 2022 ITER (International Thermonuclear Experimental Reactor) is an international collaboration to build the world’s largest, most powerful, magnetic fusion device (or Tokamak). Its objective is to demonstrate the feasibility of nuclear fusion as a practical and sustainable energy source. Once constructed, its Tokamak chamber will be approximately 30 metres in diameter. The photograph shows a set of manifolds and valve control systems associated with the Tokamak’s cryoplant.Interior of In-Vessel Training Facility of JET Fusion Reactor, No 1, 2022 A fusion reactor uses magnetic confinement to create and control high-temperature plasma for nuclear fusion. Known as a “Tokamak”, it derives from the Russian acronym which translates to “toroidal chamber with magnetic coils” (it was developed in the Soviet Union in the 1950). The Tokamak has a beigel-shaped chamber where the plasma is confined and heated to extremely high temperatures. The In-Vessel Training Facility is made up of the spare octant created for JET, which was never used, with mock-up segments to create a lifelike replica to practise remote maintenance techniques. The experimental joint European Torus (JET) is a fusion research centre which became operational in 1983. Its research led to the development of ITER, the world’s first commercial-scale fusion machine, which is being built in France as an international collaboration.Reactor Head, Sizewell B, 2023 Sizewell B is the UK’s only commercial pressurised water reactor (PWR). Its single reactor became operational in 1995. The photograph shows the reactor head on its park stand in the containment building, having been removed from the reactor vessel during refuelling. Approximately every 18 months, the reactor is closed down for maintenance and refuelling, a process known as “outage”.Turbine Hall Gauge Board, Sizewell A, No 1, 2022 Sizewell A had two Magnox reactors and was operational from 1965 to 2006. Photograph shows cooling water system control panel. This control panel operated the cooling water system, which was used to cool the turbine condenser, turning the steam back into water.North Fuel Element Debris Retrieval Plant Sort Cell Waste Transfer Tray, Trawsfynydd, 2021 This is used to transfer Intermediate Level Waste (ILW) from the Fuel Element Debris (FED) cells for radiological assay and weighing prior to placement within an ILW package.